Production Room can Boost Efficiency and Stretch the Dollar

July 29, 2009
Adding a new line? The production room can be the highest-value piece of the company to boost efficiency and stretch the dollar.

Assuming a food & beverage company can get the credit or find the cash, it’s a buyer’s market for plants seeking to add new manufacturing lines. But a primary hurdle remains, which can be summed up by this variant of a famous Bill Clintonism from the 1992 presidential campaign: It’s the stupid economy.

As the summer of 2009 peaks, food & beverage executives are as nervous as any business leaders across the industrial economy.

“The credit crisis is real,” says Marco di Gino, president of E. A. Bonelli + Associates (www.eabonelli.com), a food and dairy architectural and engineering firm based in Oakland, Calif. He has seen projects pared-down or halted at various stages, sometimes due to financing, even among companies “that used to be able to borrow $100 million with no problem.”

Others who can get the credit may nonetheless prefer to hold onto their cash reserves than capitalize on low interest rates. And contractor overtime pay, once an accepted means of achieving “priority one” — getting the project done quickly so the upgrades can begin paying-off — is beyond the pale.

Despite the uncertain economy, there are still measures plants can take when bringing on a new line. The best way to spend capital dollars on a project is to think big while spending small and to use automation to tie people and processes to management goals. Technology and management thinking are merging as high-performance, cross-trained work teams manage the plant floor using automation to synchronize their activities to serve front-office goals.

Lean beans at Starbucks

“There’s a lot of pressure on up-front capital — lots, lots, lots,” says Gerry Gomolka, vice president of process engineering for design/build firm Stellar (www.stellar.net), Jacksonville, Fla.

New-line installations in new plants have the benefit of following best practices from the start. Starbucks’ 117,000-sq.-ft. Sandy Run Roasting Facility in Gaston, S.C., completed in April, therefore presents a relevant example of the connection between corporate and plant management in setting up new lines.

Even the plant looks like a coffee shop, and inside the lines are highly caffeinated. Starbuck’s six new roasting and four packaging lines in Gaston, S.C., can receive, roast, package and ship roughly 80,000 lbs. of coffee daily, while augmenting production at four more U.S. plants and one in The Netherlands.

“One of the things that was very key to the Starbucks organization was lean manufacturing techniques: how to drive out waste and how much value can be added to the product while getting it out the door more quickly,” Gomolka says.

Lean manufacturing is a generic management model based on the successful Toyota Production System. It seeks to limit capital investments and resource allocations to operations that are valued by the customer. In the context of production and product enhancements, if the customer won’t pay for the plant upgrade, it’s probably a waste of money.

The strategy is to add value to “the product itself,” Gomolka says, explaining value is added to the product in production, not in receiving or storage. “As it turns out, the product in most plants is only actually touched by production systems for about 30 minutes out of any operating day.”

Stellar was awarded the turnkey design/build contract for the new plant, which differs from other Starbucks other operations. Whereas older Starbucks plants manufacture to target inventory levels, this one primarily is producing to market demands in real time. The plant produces to orders that come in daily. “Where the big ROI comes in is that there’s no hold-up space for product in this plant; it goes directly to the supply chain,” Gomolka says.

How fast does the new plant get its coffee out the door? The Gaston plant’s six new roasting and four packaging lines can receive, roast, package and ship roughly 80,000 lbs. of coffee daily, while augmenting production at four more U.S. plants and one in The Netherlands. There’s almost no human intervention in the process until a tape gun hits the outer carton.

There are various economies involved when you design a plant or line for a compact footprint. Stellar and Starbucks reduced the Sandy Run plant’s footprint from an initial 154,000 sq. ft. to 117,000. While it’s the second smallest of Starbucks’ plants, the Sandy Run facility is the most efficient — it produces more than three times the product per square foot than any of its sibling plants.

There are many components to the trend toward “smaller.” Lean manufacturing, mechanical trends, automation and training the workforce (including management) to make the best use of it, then, all tie into the 2009 definition of better-faster-cheaper.

In addition, with pressure to spend less on construction, “process equipment people are responding with more compact mechanical systems that do the same thing they’ve always done — often running at higher rates — but in smaller footprints and at a lower cost,” says Lloyd Snyder, senior vice president-food & beverage at Woodard & Curran, (www.woodardcurran.com) a Portland Maine, engineering firm. The result is that equipment can be close-coupled, buffers can be eliminated and processing can operate more continuously.

In bottling, for example, blow molding and filling lines traditionally have been separate processes in the plant, or often at two separate facilities. “Today, bottlers are coupling them together next to each other, where they are not only mechanically coupled, but electronically synched,” Snyder says.

Automated close coupling in a near-continuous batch environment can still support flexibility when mechanical components and automation systems coordinate the work of employees (or work cells) and streamline processes such as clean-in-place and batch changeovers.

Automation’s varied role

Automation is increasingly used to achieve higher efficiency of mechanical systems and work processes, with the consequence of higher productivity — fewer employees per unit of product output. High-level management and quality initiatives can’t happen without the software to make plant-sense of them. That’s where manufacturing execution systems come into play.

Starbuck’s six new roasting and four packaging lines in Gaston, S.C., can receive, roast, package and ship roughly 80,000 lbs. of coffee daily.

One system, CDC Factory from CDC Software (www.cdcfactory.com), Atlanta, is in use at Starbucks (as well as at Breyers Yogurt – see the iPlant story on FoodProcessing.com).  Additionally, automation can help minimize food safety risks by minimizing human contact and reducing worker injuries. Plants are realizing the value of user-friendly operator interfaces as human resource issues come to the fore.

Western Dairy Specialties in Yerington, Nev., was pinched for profits in transporting milk to California markets, and also faced the issue of a dearth of dairy experience in the local labor pool. The company turned to Tetra Pak for turnkey installation of a new 600,000 gallon per week milk production and bottling line, which included a reverse osmosis system to concentrate skim milk for standardization of solids content.

An automated Tetra PlantMaster control package minimized operator error and “enabled us to achieve the highest level of efficiency while producing an excellent quality of milk,” according to Michael Compston, the dairy’s owner.

Nevada-based Western Dairy Specialties turned to Tetra Pak for turnkey installation of a new 600,000 gallon per week milk production and bottling line.

The vendor’s services during this project included special attention to cleaning and sanitization circuits to reduce water and chemical consumption, as well as remote operator support.

“Investment decisions on production lines are part of long term planning. Trying to compromise the most efficient plant design because of the economic uncertainties would be very short-sighted,” says Jean-Pierre Berlan, sales and marketing director for Tetra Pak Processing (www.tetrapakprocessing.com), Vernon Hills, Ill.

Berlan notes that plant management needs to weigh the merits of a dedicated high-speed line against the need for flexibility to accommodate new developments. Highly automated but dedicated lines can cut costs for a few primary products, but plants may want to leave open the option of minimizing future investments by designing lines that allow expansion.

Among other trends, Berlan sees automation as a growing factor in new lines because the technology costs “are getting more competitive every year, whereas labor costs are normally increasing every year.” In keeping with lean and other manufacturing philosophies, he warns against underestimating staff selection and training. “Involving future operation staff in the design and giving the appropriate training is the best insurance for a successful project implementation.”

Sponsored Recommendations

Revolutionizing Healthcare: The Impact of Digitalization in Biopharma Innovation

Biopharma enables an entirely new level of innovation that’s simply not possible in conventional drug development. It’s an approach that can fundamentally change the way healthcare...

Navigating the Automotive Industry's Electric Future

The automotive industry is at a turning point. Bloomberg estimates that by 2040, 54% of new vehicle sales will be electric. And by 2030, we’re looking at 100% of passenger vehicles...

Unified Process Control Brings Operational Clarity

Inland Empire Utilities Agency replaces its SCADA enterprise system with the PlantPAx Distributed Control System and reduces complexity for operators

PlantPAx DCS Improves Operational Reliability

KC Water calls on R.E. Pedrotti to replace obsolete wastewater SCADA solution with a unified Modern Distributed Control System (DCS).