This case study discusses a greenfield ingredient-water project for a brewer. The resulting system was customized to treat influent water with a high salt content, maximized recovery rate and minimized change to maximize recovery rate and minimize waste volumes. SUEZ met urgent needs of the project with a mobile water bridge solution and an O&M service package to ensure the system was fully commissioned, delivered on all KPIs and the customer’s team was trained and ready for operation.
This content is sponsored by SUEZ